Trade Shows & Schools | About TEI | Build-A-Drill | Credit & Financing | Industry Links | Contact Us


HCM300

The HCM300 is used by small quarries for blasting, limited access drilling for foundation repair and tieback installation. The geothermal industry has also used the HCM line for the construction of DX geothermal wells.

Included with the HCM300:

  • HCM mounting bracket
  • TE300 hydraulic percussion drill
  • HCF or PCF feed systems with up to 6.5í drill stroke
  • HP360 positioner with feed extend
  • TE30920 air/hydraulic controls and hosing
  • JB779 nitrogen charging kit for TE300 diaphragm
  • On-site training and setup in the continental USA
  • Parts and service manual

Optional Equipment:

  • TE300HT high torque version of TE300
  • HC6 hydraulic centralizer
  • HCH6 simple hydraulic foot clamp
  • EH30920 radio controls
  • TE30851 water mist system

System Requirements:

  • HCM300 requires 30GPM @ 2250 PSI
  • HCM300HT requires 37GPM @ 2250 PSI
  • Boom lift capacity of 2,000 lbs. Less for shorter feeds
  • Flushing medium to clean holes (air or water)
  • Approximate weight is 1300 to 1800 lbs., depending on feed length